Requirements for installation and fabrication of mini warehouse
1. Foundation hardness: before pouring the foundation, Party A shall measure the hardness of the foundation in advance. If there is special terrain or the foundation hardness difference is too large, special treatment shall be made to ensure that the mini warehouse can be installed smoothly and the quality after installation is guaranteed. How to make special treatment shall be communicated with the technical department.
2. Foundation level: during the foundation pouring, the level must be measured well. After the foundation pouring, the horizontal error shall be controlled within 10 mm. Party A is required to ensure that the level of foundation is within the error during the explanation with Party A or after the foundation is completed. Otherwise, Party A shall be responsible for affecting the installation of mini warehouse or the quality after installation of mini warehouse.
3. Concrete mark: the foundation of our company's standard mini warehouse is C20.
In general, there is no reinforcement inside. In case of special terrain, foundation or special requirements of mini warehouse, the drawing of technology department shall prevail.
4. Foundation pouring time: the foundation pouring of mini warehouse of our company should be the same as the conventional concrete pouring process, and the process procedure cannot be reduced. Sufficient time should be left between the completion of foundation pouring and the installation of mini bin to ensure that the concrete reaches a certain hardness.
5. Requirements: in order to ensure the installation period, installation quality and neatness and beauty after installation, our company requires Party A to cast the indoor floor at the same time of making the foundation, and the horizontal height is the same as that of the foundation. After the installation of the mini warehouse, Party A will lay the floor indoors, which is convenient and tidy, and will not affect the quality and appearance of the mini warehouse. The height of indoor floor shall be 50 mm higher than that of foundation level. To ensure that rainwater will not flow into the room and the firmness of the ground ring beam.
6. Technical parameters of combined mini warehouse Foundation: Party A's foundation dynamic load is 500kg / m2, static load is 350kg / m2, foundation concrete grade is C20 mini warehouse second floor beam, dynamic load is 180kg / m2, static load is 230kg / m2, basic self weight is 58-66kg / m2, seismic crack prevention is 7 times, and basic wind pressure is 0.5kn/m2.
Source: mini warehouse http://shizhengao.com
09-12
Commercial use and furniture use of mini warehouse
Commercial use mini warehouse deposit office store documents, goods, office Furniture and sundries, exhibition boards, task items, etc. are provided to meet the market demand for delivery of goods for customers, as well as address for business registration. They are more suitable for abnormal small and medium-sized enterprises and online business users to deposit goods. The mini warehouse can provide a warm and wide lobby. Customers can count goods in a wide space for home decoration or moving,
09-12
Design concept of mini warehouse
Mini warehouse is popular among warehouse types. Because we often have some idle, expired items in our home days. What kind of storehouse is the storage, such as books, childhood toys, etc. Most of them can be discarded, but some have the meaning of remembrance, which is the witness of your growth in a certain period, the planning of storage mini warehouse, or the reusable items, because you need to find a local storage place. The customers served by lazy warehouse are mainly to solve the storag
09-12
How to pay attention to fire and electricity prevention of mini warehouse in autumn and winter
Now has entered the autumn and winter season, wind high dry, a little careless on the simple cause of fire, fire for the mini warehouse is particularly important. The mini warehouse is a place where materials are concentrated. Once a fire occurs, the economic loss and social impact are huge, and the consequences are serious. Therefore, it is of great significance to do a good job in the fire control work of mini warehouse, ensure the safety of stored goods, and reduce fire hazards. The managemen
09-12
Two production processes of mini warehouse materials
Assembly process of mini warehouse materials: after spraying, the assembly process is started. Before assembly, the protective sticker used in the original spraying shall be removed to ensure that no paint or powder is sprayed into the internal thread hole of the parts. During the whole process, gloves shall be worn to avoid dust on the workpiece, and some workpieces shall be blown clean with air gun. Packaging of materials in mini warehouse: after assembly, the packaging process is started. Aft